ARCHIVE FILM · ksc_011606_sssr

KSC-06-S-00001

Review conditions
KSC-06-S-00001

You're watching NASA Direct. Next on the NASA Space Shuttle Status Report: NASA rings in the new year by taking steps toward returning the space shuttle fleet to flight. The NASA Space Shuttle Status Report starts right now. I'm Stephen Payne, NASA test director, and this is the NASA Space Shuttle Status Report. Topping NASA's orbiter news this week: Inside Orbiter Processing Facility Bay 3, work continues progressing for Discovery's second space shuttle return-to-flight test mission, STS-121. New this week: technicians are focusing on installing the orbiter's fuel cells. The fuel cells are located under the forward portion of the payload bay. Fuel cells make power for the orbiter by mixing hydrogen and oxygen to produce electricity. The fuel cells also create potable water that is pumped into storage tanks for the crew to use. Also on Discovery, a crew module leak check. To perform the leak check, technicians must close all the hatches and pressurize the cabin to monitor for pressure decay. Atlantis makes progress inside Orbiter Processing Facility Bay 1 in preparation for mission STS-115 in 2006. The most recent milestone: Atlantis' Remote Manipulator System installation. The RMS

Review conditions

Rights evidence

NASA media-use guidance applies; NASA identifiers, endorsement, third-party material, and personality rights require separate review.

Suggested attribution
KSC-06-S-00001. Credit: NASA / KSC.

Normalized by rights-v2-discovery. This is evidence routing, not legal advice.