Space Shuttle Project
Review conditions
Space Shuttle Atlantis takes flight on its STS-27 mission, December 2, 1988, utilizing 375,000 pounds of thrust produced by its three main engines. The engines start in 3.9 seconds of ignition and go to static pump speeds of approximately 35,000 revolutions per minute during that time. The Marshall Space Flight Center had management responsibility of Space Shuttle propulsion elements, including the Main Engines.
Cite the original evidence
Export the archive attribution and source link. Uncertain dates and rights stay explicit; a citation does not grant reuse permission.
Read citation and provenance
Space Shuttle Project. NASA Image and Video Library. https://images.nasa.gov/details/8898508. Original archive ID: 8898508 Date as catalogued: Historical date not independently verified Rights: REUSE_ALLOWED_WITH_CONDITIONS. Consult source terms. PastTrace discovery record: https://pasttrace.com/record/nasa-image-ODg5ODUwOA
Research context: NASA Image and Video Library · Verify this item · Cite the source or clip
Rights evidence
Public access is separate from reuse rights. Normalized by ; verify the original source before reuse.
