Artemis II Engine Section Moves to Final Assembly
Review conditions
On May 24, 2022, the core stage production team moved the Space Launch System (SLS) rocket engine section for Artemis II to the core stage final integration area at NASA’s Michoud Assembly Facility in New Orleans. While there, the engine section team is completing installation of the main propulsion systems, finishing integration of the electrical and avionics systems, and preparing for functional testing of the various systems. During final integration, the team also will install remaining internal thermal protection systems and prepare to position the engine section from vertical to horizontal so that it can be joined with the rest of the core stage. The engine section is located at the bottom of the core stage and includes the rocket’s main propulsion systems that connect to the core stage’s four RS-25 engines that will help launch the Artemis II lunar mission. This fall, the engine section will be horizontally integrated with the previously-joined forward assembly and liquid hydrogen tank to complete the core stage. NASA and core stage lead contractor Boeing are building core stages for the next three Artemis missions. The 212-foot core stage with its RS-25 engines will provide
Rights evidence
NASA media-use guidance applies; NASA identifiers, endorsement, third-party material, and personality rights require separate review.
Artemis II Engine Section Moves to Final Assembly. Credit: NASA / MAF.
Normalized by rights-v2-discovery. This is evidence routing, not legal advice.
